Public Comment for ASCE/SEI 7-22

Public Comment for the 2022 edition of ASCE/SEI 7 Minimum Design Loads and Associated Criteria for Buildings and Other Structures will be open mid-June through July. The comment deadline is July 31, 2021.  Accessing the Public Comment System will require using or creating an ASCE user account. Details are available at www.asce.org/structural-engineering/asce-7-and-sei-standards For additional questions contact ASCE Codes and Standards Senior Administrator James Neckel at jneckel@asce.org.

About the author  ⁄ STRUCTURE magazine

STRUCTURE magazine